SOLICITATION
Solicitation Detail
REPAIR F-16 HARDENED AIRCRAFT SHELTER (HAS) ROOFS
Posted Date
2022-08-05
Type
Solicitation
Response Deadline
2022-09-07 03:00
NAICS Code
construction (NAICS 23839)
Place Of Performance
KOREA
Descriptioln
The work to be performed for completion of this project shall be in
general as described below and executed by the contractor.
Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and
any other resources necessary to accomplish the scope of work contained herein as listed below and in
accordance with the drawings, sketches, and specifications.
1. Provide double steel pipe scaffolding around the building including fabricating and
dismantling.
2. Clean and prepare the concrete surfaced areas with water jet cleaning such as exterior arched
roof, roof over baffle, exterior wall of baffle, exterior wall of bulkhead & rear to apply acrylic
fluid-applied water proofing coating system.
3. After removing any loose debris and contamination from the existing pits or holes or cracks
all over the concrete surfaced areas, fill them with elastic putty so they are flush with the
surrounding substrate.
4. Apply primer (0.06mm) – first intermediate coat (0.6mm) - reinforcing fabric - second
intermediate coat (0.6mm) - top coat (0.05mm) on the concrete surfaced areas according to the
manufacturer’s standard procedure of acrylic fluid-applied water proofing coating system.